The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Walk-In Services
Walk-In Services
The traffic section offers walk-in services to assist customers with inquiries about issues including design requirements, red tags, status of commercial and residential projects, inspections, etc.
Note:
Walk-in services do not address existing project review comments. For traffic review comments, please contact the project reviewer directly.
Every Tuesday and Thursday (excluding City Holidays) from 8:00 AM till 3:00 PM.
1002 Washington Avenue, 2nd Floor
Houston, TX 77002
Please consider using our live chat for easier access to our assisting team.
The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Infrastructure Design Manual (IDM) Variances
Infrastructure Design Manual (IDM) Variance Request Form for Privately Funded Projects
A variance is an allowed deviation from the standard rules and regulations of Chapter 10 and 15 of the Infrastructure Design Manual (IDM). Requests are reviewed and evaluated by the Office of the City Engineer.
- IDM Variance Request Form for Privately Funded Projects
- Please follow instructions and procedures on the 1st page of the application form.
- Form shall be completed by an Engineer or Architect with reasonable engineering judgement based upon site conditions or limitations.
- All incomplete variance request forms will be returned.
- Variances are granted based solely on technical and engineering justifications; cost or financial reasons are not considered as justification to grant a variance.
The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Sidewalk Information
Sidewalk Information
A new sidewalk ordinance went into effect on October 1, 2020. The Planning Department reviews sidewalk widths and applications for sidewalk modifications within the city limits of Houston. For more information, please contact the Planning Department.
Planning Department Contact Information:
Phone: (832) 393-6660
Location: 1002 Washington Ave, 3rd Floor Houston, TX 77002
Email: [email protected]
Website: www.houstontx.gov/planning/sidewalk-regulations.html
**Traffic Right of Way section only reviews the engineering components of sidewalk construction details**
The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Alleys
Alleys Information
For more information regarding alleys, please refer to the City of Houston Code of Ordinances, Chapter 40, Article XV.
The City of Houston Accepted Alleys list is provided below:
The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Access Management Form
Access Management Form (AMF)
An Access Management Form is required for all commercial developments except for developments with no change in use and/or size. Alterations to roadway access points may result in significant site plan revisions. For this reason, Access Forms should be submitted prior to or during plat submittal. If platting is not required, this form shall be approved prior to submitting plans for permitting.
AMF Application Form:
Carefully read the form and completely fill out the form.
Trip Generation Information:
For trip generation information please refer to the latest edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual.
Instructions:
-
Subject Line of any correspondence should be consistent and unique, such as:
-
Project Name/Project Address
-
Project Number
-
-
Please include the following items with the completed Access Management Form application:
-
Dimensioned Civil Site Plan
-
Recorded plat/Re-plat
-
CPC 101 Conditions (if applicable)
-
Certified Survey
-
The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Traffic Impact Analysis
Traffic Impact Analysis (TIA)
The purpose of a TIA is to identify the adequacy of the existing street right of way to accommodate any changes in trips generated from a proposed development/redevelopment (as a stand-alone development or a stage of a master plan). If impacts are identified, potential mitigation measures (on-site or off-site) can be proposed and evaluated. The traffic impact analysis will be used to make a determination as to whether driveway(s) being considered are necessary to provide reasonable access to the private property consistent with the safety and convenience of the public.
For more information regarding Traffic Impact Analysis, please refer to Chapter 15 of the City of Houston IDM.
Objectives of a TIA within the City of Houston
- To identify any and all potential adverse traffic impacts to the existing area street system, the surrounding community and to additional proposed developments.
- To identify transportation improvements with an aim to cost effectively mitigate identified adverse traffic impacts to mobility within the study area/analysis area.
- To assist public and private sector entities in identifying and resolving issues related to the location of driveways, median openings, turn lanes, traffic signals, and other transportation facilities.
Scheduling a Scoping Meeting
To schedule a scoping meeting, please email Ms. Angela Washington at [email protected]. Attach all required scoping meeting documents in the email.
Required Scoping Meeting Documents:
- Copy of the reviewed Access Management Form
- Dimensioned Civil Site Plan
- Exhibits showing the following:
- Development Information
- Location and Analysis Area
- Trip Generation Information
- Proposed Study Intersections
- Proposed Trip Distribution
- Proposed Growth Rate
Traffic Impact Analysis (TIA) Report Submittal
Once the engineer completes the Traffic Impact Analysis report for the proposed development, send a PDF copy of the TIA report to [email protected]. The Traffic Impact Analysis report must bear the seal and signature of a Texas Licensed Professional Engineer specializing in the branch of civil engineering.
TIA Related Documents
- TIA Milestones
- TIA Scoping Meeting - Typical Meeting Agenda
- TIA Content Guide and OCE Format Requirements Update 12_22_2020
- TIA Approval Package
The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Office of the City Engineer Plan Reviews
Office of the City Engineer (OCE) Review
All OCE plans and profiles must be designed and submitted to OCE department by a register PE Civil Engineer.
- Refer to the OCE Plan Review User Guide for the procedures for submittal.
- Office of the City Engineer Contact Information
Email: [email protected]
Phone: 832.394.9110
The City of Houston Right of Way – Traffic and Mobility section enforces the city’s ordinance that regulates sidewalks, streets, driveways, and traffic control, by managing the review and approval of plans and processing of construction permits.
Additionally, the section reviews and approves mobility permits for lane closures.
List Title
Mobility Projects
A mobility permit allows the City to maintain a safe and orderly movement of vehicles and pedestrians through safe work zone practices.
It shall be unlawful for any person to place, cause, or allow any impairment or obstruction of a sidewalk or roadway, except as authorized by a permit. Permits should be secured prior to obstructing a public roadway or public sidewalk.
For information on how to apply for a mobility permit, please refer to mobility permits.
Permit Types
Residential Driveway, Sidewalk, or Curb & Gutter Permit
Residential Sidewalk Panel Replacement
Contact
1002 Washington Ave., 2nd Floor
Houston, TX 77002
Building Code Enforcement
Commercial Plan Review
A commercial plan review is required for all new construction, or conversion of existing buildings, or additions to existing buildings.
Commercial Plan Review Submittal Information:
-
1002 Washington Ave., 3rd floor Houston, TX 77002
-
832.394.8810
- [email protected]
All plans are submitted electronically via iPermits.
The Traffic Right of Way section reviews and approves the driveway/sidewalk permit for all commercial project submittals within the limits of the City of Houston.
One Stop Plan Review
All one stop projects must be submitted online through the one stop department intake process in ProjectDox.
Please take note of the following items below:
- Remove & Replace Driveways for existing houses and empty lots can be submitted as one stop projects
- Access Driveways for empty lots can be submitted as one stop projects.
- All proposed homes/residential plans and all proposed commercial building developments must be submitted through the normal building code enforcement plan review (BCE) with a new project number and a new submittal.
- All driveway approaches must comply with City of Houston (COH) Infrastructure Design Manual (IDM) requirements. Refer to Chapter 15 of the COH IDM.
One Stop Review Contact
Email: [email protected]
Phone: 832.394.9149
Residential Plan Review
A residential plan review is required for all residential new construction (single-family, duplex, detached), remodel, or addition to an existing residential building.
Residential Plan Review Submittal Information:
- 1002 Washington Ave., 3rd floor Houston, TX 77002
- 832.394.8820
- [email protected]
All plans are submitted electronically via iPermits.
The Traffic Right of Way section reviews and approves the driveway/sidewalk permit for all residential project submittals within the limits of the City of Houston.


