Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Builder's bond for sidewalk, driveway, curb and gutter. Bond period of less than one year.
Request changes to your WCR letter.
Last updated: 05.19.2022. This document is maintained by Utility Analysis.
Step by step guide for applying for a wastewater capacity letter online.
Last updated: January 18, 2022
This is a building permit application for Electrical Systems and Wiring within the city limits of Houston, Texas.
Last updated: January 2025
Procedures for obtaining a small water meter.
Last updated: June 7, 2022
This is a permit application for a Sidewalk, Driveway, Curb and Gutter, and Culvert Parking lot within the city limits of Houston, Texas.
Last updated: 10/13/2020
Commissioning statement for the mechanical systems, service water heating systems, and building envelope.
Last updated: February 2024
Last Updated: August 2024
Application to request a contractor name change or address change on an existing building permit.
Last updated: January 2025