Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Last update: December 29, 2021
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
Cover sheet for easement dedication submittals to the Office of the City Engineer.
Last updated: January 2026
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
Transfers capacity to a new property owner. (form UA003)
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
Complete this form for permit and inspection of Type 1 Hood fire suppression systems (FSS), or when submitting plans for fire alarm, fire sprinkler, or underground fire lines, or when requesting a Go to Work permit.
Last updated: January 2026