Use a mixture of filters or keywords to find documents and resources by department, type or topic.

SOLAR APP+ PERMIT IPERMITS HOW-TO-GUIDE (CE_1413)

Last Updated: May 2025.

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Form 584 - Water Meter Easement Dedication

Easement dedication form for water meters (Form 584)

Fabricator Qualification Statement (CE1269)

Last updated: June 02, 2025.

2021 Division 02-16 Standard Construction Specifications

2021 edition of the Standard Specifications

Residential Re-Roof Only Worksheet (CE1109)

This worksheet should only be completed to obtain permits for residential re-roof or roof repairs. Please note that this includes deck and covering but NOT rafters and/or joists.

Last updated: 10/09/2019

02751-01 Concrete Pavement Details

Concrete Pavement Details 

Updated 11-26-2023

Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised: March 2024

00456 Bidders Certification Of Compliance With Buy American Program
Energy Compliance Information Certificate

The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.

Last updated: February 20, 2025