Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Notice of Sidewalk Panel Replacement

Notice to begin sidewalk panel replacement work.

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Standard Details Redlines from 2022-2023 Review Cycle

Standard Details Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Importing Standard Details Guide

Guide on how to import standard details into the project title block.

Last updated: December 11, 2023

Stationary Engineer License Requirements (CE1221)

Stationary Engineer License Requirements.

Last updated 01-01-2024

Registration Process for Electrical Master and Contractor (CE1203)

Registration & Renewal Process for Electrical Master & Contractor.

Last updated: January 2024

How To Apply For COO Inspection

How-To Guide On Applying For Certificate of Occupancy

Revised 06-04-2021

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

Approved Fabricator Guidelines (CE1285)

Guide explains the requirements and procedures of the COH approved fabricator program. 

Last updated: January 2024