Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Importing Standard Details Guide

Guide on how to import standard details into the project title block.

Last updated: December 11, 2023

02520-02 Fire Hydrant On A Steel Section (DWG)
22-05-R, 1-Hour Fire-Rated Wood Stud Exterior Wall

1 Hour Fire-Rated Wood Stud Exterior Wall

Revised 01/17/2023

Sponsor Change Form

Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Last update: 03/01/2024.

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

25-10-R Door Barrier Solid Mansory Wall Construction (Dangerous Building)

Last Updated: April 2025.

18-04-R Residential Garage Dwelling Separation
16-06-R Appendix L Illustration

Appendix L Illustration

22-03-R, 1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall) 

Updated 01/17/2023

25-01-R Two family dwelling horizontal separation

Last Updated: January 2025