Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Importing Standard Details Guide
Guide on how to import standard details into the project title block.
Last updated: December 11, 2023
02520-02 Fire Hydrant On A Steel Section (DWG)
22-05-R, 1-Hour Fire-Rated Wood Stud Exterior Wall
1 Hour Fire-Rated Wood Stud Exterior Wall
Revised 01/17/2023
Sponsor Change Form
Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Last update: 03/01/2024.
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle
Updated 11-26-2023
25-10-R Door Barrier Solid Mansory Wall Construction (Dangerous Building)
Last Updated: April 2025.
18-04-R Residential Garage Dwelling Separation
22-03-R, 1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)
1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Masonry Wall)
Updated 01/17/2023
25-01-R Two family dwelling horizontal separation
Last Updated: January 2025