Use a mixture of filters or keywords to find documents and resources by department, type or topic.

List of Approved Emergency Responder Communication Coverage (ERCC) Designer/Lead Installation Personnel

List of Emergency Responder Communication Coverage (ERCC) Designer/Lead Installation Personnel approved by the City of Houston to perform special inspections.

Last updated: February 19, 2026

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

24-02-R Examples of Required Plans (Residential Information Package-2)

Revised 03/25/2024

24-03-R Foundation for Additions

Revised 03/25/2024

13-04-R Masonry Column for Wrought Iron Fences
13-05-R Block & Base Foundations
08C07-2 Commercial Ramp & Landing - 2
17-06-R Residential Elevated Deck
ERCC Designer/Lead Installation Personnel Qualification Statement (CE1348)

Last Update: June 2025

Building Code Enforcement Emergency Responder Communication Coverage (ERCC) Designer/Lead Installation Personnel Qualification Statement

Form CE_1348

03 Technical Memo, Break Tanks and Fire Pumps.pdf

This technical memo is provided to describe the new changes to the Houston Building Code and Houston Fire Code with regards to the requirement for fire pumps and break tanks. 

 

Uploaded 2-13-2024