Use a mixture of filters or keywords to find documents and resources by department, type or topic.
List of Standard Details
Updated 5/22/2024
2021 Detail for 02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger (effective October 1, 2021)
Last updated: July 6, 2021
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle
Updated 11-26-2023
Standard Details Redlines from 2022-2023 Review Cycle
Updated 11-26-2023
The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.
Last updated: February 20, 2025
2020 Detail for 02317-09 Standard LDWL Excavation and Backfill Detail