Use a mixture of filters or keywords to find documents and resources by department, type or topic.

How To Apply For COO Inspection

How-To Guide On Applying For Certificate of Occupancy

Revised 06-04-2021

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Securing Vacant Building Application (CE1414)

Last Updated: May 14, 2025.

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

02951-01 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement <= 5yrs

02951-01 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement <= 5yrs

Updated 11-26-2023

02951-05 Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)

02951-05 Pavement Repair Detail for Street Cuts  (Non-Reinforced Concrete & Brick Pavement)

Updated 11-26-2023

Notice of Sidewalk Panel Replacement

Notice to begin sidewalk panel replacement work.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: April 2025

02951-04_2023_11_MOD.dwg

02951-04 Pavement Repair Detail for Street Cuts (Flex-Base Pavement & Concrete Pavement)

Updated: 12-18-2023

02951-02_2023_11_MOD.dwg

02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs

Updated 12-18-2023