Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Last Updated: May 2025
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024
This guide provides the requirements for the placement and reconnection of manufactured homes.
Last updated: 04-03-2025
Registration & Renewal Process for Electrical Master & Contractor.
Last updated: January 2024
Last updated: 03/08/2024
Permitting, plan review and inspection guidelines for electric vehicle charging station.
Last updated: 10/22/2019
This guide provides the requirements for repairing dangerous buildings.
Last updated: 04-03-2025
How-To Guide On Applying For Certificate of Occupancy
Revised 06-04-2021
Notice of completion for sidewalk panel replacement work.
Last Updated: May 14, 2025.