Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Asbestos Survey Guideline (CE1258)

Senate Bill 509 requires municipalities to verify that an asbestos survey has been conducted prior to issuing renovation or demolition permits for public or commercial buildings, and affects renovation and demolition permits for public or commercial buildings issued by municipalities on or after January 1, 2002.

Last updated: 06/09/2022

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Standard Details Redlines from 2022-2023 Review Cycle

Standard Details Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Pedestrian Protection Permit Guideline (CE1124)

This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.

Last updated: 01-01-2023

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

Solar APP+ Application Guidelines_CE-1410

Last Updated: June 20, 2025.

Sign Administration Frequently Asked Questions (CE-1422)

Sign Administration Frequently Asked Questions

Updated: November 2025.

14-03-R Single Family Residential Driveways Interlocking Concrete Permeable Paver and Flexible Plastic Grid Paver Systems

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024