Use a mixture of filters or keywords to find documents and resources by department, type or topic.
One Stop Walk-in Service Prerequisite Checklist (CE-1412)
Revised: February 2025
02520-02 Fire Hydrant On A Steel Section (DWG)
Importing Standard Details Guide
Guide on how to import standard details into the project title block.
Last updated: December 11, 2023
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle
Updated 11-26-2023
Chapter 13 2021
Supplement to IDM Chapter 9 (May 16, 2025)
Last Updated: 05/16/2025
02502-03 12 Diameter Waterline Crossing (DWG)
Owner Self-certification Worksheet
Project cost estimate worksheets for if an owner is doing work with or without a contractor.
List of Standard Details.pdf
List of Standard Details
Updated 5/22/2024
Ordinance No. 2018-258
Signed and adopted changes to the City's floodplain ordinance, Chapter 19.