Use a mixture of filters or keywords to find documents and resources by department, type or topic.

TxDOT Sanitary Sewer Details
Swimming Pool Demolition Guidelines (CE1090)

The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.

Last updated: January 2026

02502-04 8 Diameter Waterline (DWG)
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Standard Details Redlines from 2022-2023 Review Cycle

Standard Details Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Registration Form for Elevator Contractor (CE1351)

Form for registering licensed elevator contractors with the City of Houston

Last updated: Jan. 10, 2024

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024