Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Checklist 30pct 50pct And 70pct For Developer Participation Contract

Developer Participation Contract (DPC) checklist for developers.

Last updated: 3/21/2022

Importing Standard Details Guide

Guide on how to import standard details into the project title block.

Last updated: December 11, 2023

Energy Testing Results (CE1302)

When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.

Last updated: 01-30-2024

00455 Affidavit of Ownership or Control Form

Last updated 04/15/2020

Energy Compliance Information Certificate

The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.

Last updated: February 20, 2025

02520-02 Fire Hydrant On A Steel Section (DWG)
General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

CE-1396 Residential Energy Efficiency Certificate

Last updated: 03/08/2024

Chapter 13 2021
Supplement to IDM Chapter 9 (May 16, 2025)

Last Updated: 05/16/2025