Use a mixture of filters or keywords to find documents and resources by department, type or topic.

05 Technical Memo, Solar-Ready Appendices.pdf

This technical memo is provided to describe the new changes to solar readiness in the Houston Amendments to the 2021 Residential Code (IRC) and the 2021 International Energy Conservation Code (IECC). 

Uploaded 02/13/2024

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Wastewater Capacity Reservation Site Transfer Application (UA004)

Transfer capacity to another site within the same treatment plant. (form UA004)

Last updated: 07.20.2019. This document is maintained by the Utility Analysis.

Transient Meter Forms for CIP Projects

Application forms for transient meters on capital projects only (CIP projects).

Sewer Tap Permit Procedure

Procedures for obtaining a sanitary sewer tap permit.

Last updated: 8/1/2018

Donation Station Ordinance 2023-151

Ordinance No. 2023-151 amends the City's donation box ordinance to include donation stations.

Last updated: Mar. 20, 2023

Developer Payment Bond - Non DPC

Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

10 Technical Memo, Mechanical Ventilation in New Homes.pdf

This technical memo is provided to describe the importance of mechanical ventilation in new homes and the relevant Houston Construction Code requirements to consider for mechanical ventilation construction. 

Uploaded 2-13-2024

ISPSC Significant Changes PowerPoint

Significant changes & highlights of the 2021 Swimming Pool and Spa Code

Code Word 2012-B49 Definitions Related to Administrative Processes

Definition terms related to existing building alterations that are used for administrative processes associated with plan review and permitting.