Use a mixture of filters or keywords to find documents and resources by department, type or topic.
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
Procedures for obtaining water main extension permit.
Last updated: 1/1/2019
Footing/Foundation Certification Program
Updated: November 2025.
This policy establishes and builds upon the requirement in Sec. 28-212 regarding hotel employee training and certification requirements.
Last updated: October 12, 2023
Supplemental slide for ECPAT-USA training module
Last updated: 10/9/2020
Tip sheet for obtaining a floodplain permit for a residential remodel project in the floodplain.
Awning & Canopy-type Signs.
Last Updated: December 5, 2025