Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Post Install Solar Inspection Letter (CE-1387a)
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022
11-04-R Residential 4 foot Wood Bulkhead
24-02-R Examples of Required Plans (Residential Information Package-2)
Revised 03/25/2024
Commercial or Residential Roofing Overlay Only (CE1104)
Last updated: 10/09/2019
09C02 Commercial Steel Stairs
17 Technical Memo, Social Stair Handrail Requirements.pdf
This technical memo is provided to describe the new changes to the Houston Construction Codes with regards to the amendment related to the requirements of Social Stair Handrail requirements.
Uploaded 2-13-2024
08C01 Commercial Wood Stairs
10-07-C Commercial Wood Stairs with Landing
Dangerous Building Demolition (CE_1280)
This guide provides the requirements for demolition of dangerous buildings.
Last updated: 04-03-2025
Building Code Enforcement Permit Fee Schedule
Quick reference handout listing Building Code Enforcement's permit fees, effective January 1, 2026.
Last updated: 1/1/2026