Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02465-02 Pedestal | Pushbutton Pole Drilled Shaft Foundation
02465-02 Pedestal/Pushbutton Pole Drilled Shaft Foundation
Updated 11-26-2023
02082-05 Crushed Stone Supported Manhole For Wet Stable Trench
01555-11 TCP Typical Construction Zone at a 4-Way Intersection (Low Volume Traffic) Phase 3 of 4
01555-11 TCP Typical Construction Zone at a 4-Way Intersection (Low Volume Traffic) Phase 3 of 4
Updated 11-26-2023
01555-10 TCP Typical Construction Zone at a 4-Way Intersection (Low Volume Traffic) Phase 2 of 4
01555-10 TCP Typical Construction Zone at a 4-Way Intersection (Low Volume Traffic) Phase 2 of 4
Updated 11-26-2023
01555-01_2023_11_MOD.dwg
01555-01 TCP Notes Channelizing Devices and Barricades
Updated 12-21-2023
02317-02 Sanitary Or SS Crushed Stone Foundation For Wet Stable Trench
02317-02 Sanitary Or SS Crushed Stone Foundation For Wet Stable Trench
02526-16 Schematic Above Ground Fire Rated Compound Meter Installation
Standard Details Redlines from 2022-2023 Review Cycle
Standard Details Redlines from 2022-2023 Review Cycle
Updated 11-26-2023
02775-10_2023_11_MOD.dwg
02775-10 Retrofit Bikeway at Floating Bus Stop
Updated 12-19-2023
02771-02_2023_11_MOD.dwg
02771-02 14" Wide Precast Concrete Curb
Updated 12-19-2023