Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Last Updated: June 20, 2025.
Checklist of plan review requirements for electronic locks.
Last updated: 11/18/2019
In an attempt to reduce the number of plan submittals, the following items are required in the construction documents for all Residential Site Improvement projects.
Last updated: 10/15/2019
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
Beginning June 6, 2012 all new construction plans will require the following items to be clearly identified on the site plan to demonstrate foundation elevation compliance.
Last updated: 6/6/2016
The template drawing is to assist in the preparation of plans for residential remodeling and addition projects.
Last Updated: April 2025
Options for phase construction permitting and plan review
Last updated: September 2025.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.