Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Procedures and qualifications for paid plan review (customer paid overtime).
Last updated: 1/1/2020
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Procedures for obtaining water main extension permit.
Last updated: 1/1/2019
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.
This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.
Last updated: 01-01-2023
Application for large meters.
Last updated: 6/13/2022
Procedures for obtaining a permit for lateral sanitary sewer main extension.
Last updated: 8/1/2018
Application for establishing a commercial water and wastewater billing account with Customer Account Services.
Last update: 01/04/2021