Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02082-13 Storm Sewer Precast Box Manhole

Drawing 02082-13 Storm Sewer Precast Box Manhole (effective November 27, 2023)

 

Last updated: November 26, 2023

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

List of Standard Details-Storm Sewer Details

List of Standard Details – Storm Sewer Details  

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

17-08-R Emergency Escape and Rescue Windows (Examples)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

17-10-C Repair of Flooded 2-Hour Fire Wall

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Pedestrian Protection Permit Guideline (CE1124)

This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.

Last updated: 01-01-2023

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022