Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Drawing 02082-13 Storm Sewer Precast Box Manhole (effective November 27, 2023)
Last updated: November 26, 2023
Procedures and qualifications for paid plan review (customer paid overtime).
Last updated: 1/1/2020
Presentation slides used during the 2021 Infrastructure Design Manual webinar held on Aug. 19, 2021.
List of Standard Details – Storm Sewer Details
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
City of Houston Standard Detail Title Block - ANSI A (8.5 x 11 inches) uploaded 12-12-2023
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.