Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This document is maintained by the Texas Department of Transportation (TxDOT).
Drawing 02082-13 Storm Sewer Precast Box Manhole (effective November 27, 2023)
Last updated: November 26, 2023
Procedures and qualifications for paid plan review (customer paid overtime).
Last updated: 1/1/2020
List of Standard Details – Storm Sewer Details
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The Mayor’s Office of Special Events accepts applications between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday, except for City-observed Holidays.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.