Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Guidelines for a Successful Mylar Walk Through

Guidelines for a successful mylar walk through.

Last updated: 12/6/2019 

Foundation Elevation Plan Review Requirements

Beginning June 6, 2012 all new construction plans will require the following items to be clearly identified on the site plan to demonstrate foundation elevation compliance.

Last updated: 6/6/2016

Phased Construction Permitting Options (CE1098)

Options for phase construction permitting and plan review

Last updated: September 2025.

Substantial Damage Determination Request Form

Application form to request a determination of substantial damage.

08C11 Commercial Door Schedule

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

08C10 Interior Wood Partition

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Substantial Damage Estimate Request Form

Application form to request a substantial damage estimate of a property.

Substantial Damage Determination Appeal Form

Application form to appeal a determination of substantial damage.

08C09 Interior Steel Partition (Revision 1)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.