Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
Beginning June 6, 2012 all new construction plans will require the following items to be clearly identified on the site plan to demonstrate foundation elevation compliance.
Last updated: 6/6/2016
Options for phase construction permitting and plan review
Last updated: September 2025.
Application form to request a determination of substantial damage.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Application form to request a substantial damage estimate of a property.
Application form to appeal a determination of substantial damage.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.