Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Please contact us at the information below.
Phone: 832.393.5603 and can also Email: [email protected].
Drawing 02082-13 Storm Sewer Precast Box Manhole (effective November 27, 2023)
Last updated: November 26, 2023
Procedures and qualifications for paid plan review (customer paid overtime).
Last updated: 1/1/2020
List of Standard Details – Storm Sewer Details
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
February 2018
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.
Last updated: 01-01-2023