Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
02082-03 5'-0" - 8'-0" Diameter Precast Concrete Manhole
02317-09 (2020 Detail)
2020 Detail for 02317-09 Standard LDWL Excavation and Backfill Detail
02447-01 Bedding Backfill Auger Pit Auger Hole
02082N-02 4'-0 Diameter Precast Concrete Manhole Notes
02082N-03 5'-0 to 8'-0 Diameter Precast Concrete Manhole Notes
TxDOT Sanitary Sewer Details
02317-02 Sanitary Or SS Crushed Stone Foundation For Wet Stable Trench
02531-05 Installing Sanitary Sewers Crossing Or Parallel To Water Lines