How To Apply For COO Inspection

How-To Guide On Applying For Certificate of Occupancy

Revised 06-04-2021

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Securing Vacant Building Application (CE1414)

Last Updated: May 14, 2025.

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: January 2026

Commercial Elevator Permit Application (CE1331)

For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.

Last updated: March 2025

Notice of Sidewalk Panel Replacement

Notice to begin sidewalk panel replacement work.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: April 2025

Homeowner's Plumbing and Irrigation System Permit Application Spanish (CE1284-S)

Last updated: January 2026

Sidewalk Panel Replacement Guide

Sidewalk Panel Replacement Guide.