Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Dangerous Building Repair (CE_1336)

This guide provides the requirements for repairing dangerous buildings.

Last updated: 04-03-2025

How To Apply For COO Inspection

How-To Guide On Applying For Certificate of Occupancy

Revised 06-04-2021

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Securing Vacant Building Application (CE1414)

Last Updated: May 14, 2025.

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

Non-CP / Private Cover Sheet

Updated: November 1, 2025.

Notice of Sidewalk Panel Replacement

Notice to begin sidewalk panel replacement work.

CP Sheet Index (DWG)
Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: April 2025

Sidewalk Panel Replacement Guide

Sidewalk Panel Replacement Guide.