Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

02082-06 Sanitary Sewer Manhole Vent for Sealed Manhole

2021 Detail for 02082-06 Sanitary Sewer Manhole Vent for Sealed Manhole (effective October 1, 2021)

 

Last updated: July 6, 2021

02083N-01 4'-0 Diameter Fiberglass Manhole Notes
02082-03 5'-0" - 8'-0" Diameter Precast Concrete Manhole
02082N-02 4'-0 Diameter Precast Concrete Manhole Notes
Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

02082N-03 5'-0 to 8'-0 Diameter Precast Concrete Manhole Notes