Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

02082-03 5'-0" - 8'-0" Diameter Precast Concrete Manhole
02082N-02 4'-0 Diameter Precast Concrete Manhole Notes
02082N-03 5'-0 to 8'-0 Diameter Precast Concrete Manhole Notes
02090-01 Manhole Frame And Cover

02090-01 Manhole Frame And Cover

TxDOT Sanitary Sewer Details
02317-02 Sanitary Or SS Crushed Stone Foundation For Wet Stable Trench
02531-05 Installing Sanitary Sewers Crossing Or Parallel To Water Lines
02317-03 Sanitary or Storm Sewer Bedding and Backfill for Dry Stable Trench

02317-03       Sanitary or Storm Sewer Bedding and Backfill for Dry Stable Trench

Updated 11-27-2023

Stationary Engineer License Requirements (CE1221)

Stationary Engineer License Requirements.

Last updated: February 2026