Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

TxDOT Water Details
House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 12-11-2023

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

TxDOT Sanitary Sewer Details
Sidewalk Panel Replacement Guide

Sidewalk Panel Replacement Guide.

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022