Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02775-08 Sidewalks and Clear Zone Transit Corridor Street

Sidewalks and Clear Zone Transit Corridor Street 

Updated 11-26-2023

01510-01 through 01510-14
  • 01510-01 General Notes and Legends
  • 01510-02 Left/Right-Turn "Only" and Arrow Spacing
  • 01510-03 Standard Pavement Marking (Words)
  • 01510-04 Standard Pavement Marking - Symbols
  • 01510-05 Standard Pavement Markings with Reflective Raised Pavement Markers for Position Guidance
  • 01510-06 Reflective Chip Seal Marker Use for Temporary Markings
  • 01510-07 Pavement Markings for Accessible Parking
  • 01510-08 Railroad Crossing Pavement Marking Details
  • 01510-09 Bicycle Lane Pavement Markings
  • 01510-09A Bicycle Intersection Treatments
  • 01510-10 Typical Crosswalk Details
  • 01510-11 Left-Turn Lane & Right-Turn Lane Design Worksheet 1
  • 01510-12 Left-Turn Lane & Right-Turn Lane Design Worksheet 2
  • 01510-13 Two-Way Left-Turn Lane Detail 1
  • 01510-14 Two-Way Left-Turn Lane Detail 2
02771-01 Curb, Curb and Gutter, and Header Details

02771-01 Curb, Curb and Gutter, and Header Details

Updated 11-26-2023

02775-06 Detectable Warning Curb Ramp Details

Detectable Warning Curb Ramp Details 

Updated 11-26-2023

02775-09 Perpendicular Curb Ramp

Perpendicular Curb Ramp 

Updated 11-26-2023

02775-02 Typical Curb Ramp Details

Typical Curb Ramp Details 

Updated 11-26-2023

2147 Prerequisites Plan Procedures

Prerequisites Plan Procedures.

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 10/22/2024

Frequently Missed Inspection Items (CE1354)

Last updated: June 09, 2025

02754-03_2023_11_MOD.dwg

02754-03 Proposed Sidewalk Through Driveway with Excessive Elevation Difference

Updated 12-19-2023