Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02775-08 Sidewalks and Clear Zone Transit Corridor Street
Sidewalks and Clear Zone Transit Corridor Street
Updated 11-26-2023
01510-01 through 01510-14
- 01510-01 General Notes and Legends
- 01510-02 Left/Right-Turn "Only" and Arrow Spacing
- 01510-03 Standard Pavement Marking (Words)
- 01510-04 Standard Pavement Marking - Symbols
- 01510-05 Standard Pavement Markings with Reflective Raised Pavement Markers for Position Guidance
- 01510-06 Reflective Chip Seal Marker Use for Temporary Markings
- 01510-07 Pavement Markings for Accessible Parking
- 01510-08 Railroad Crossing Pavement Marking Details
- 01510-09 Bicycle Lane Pavement Markings
- 01510-09A Bicycle Intersection Treatments
- 01510-10 Typical Crosswalk Details
- 01510-11 Left-Turn Lane & Right-Turn Lane Design Worksheet 1
- 01510-12 Left-Turn Lane & Right-Turn Lane Design Worksheet 2
- 01510-13 Two-Way Left-Turn Lane Detail 1
- 01510-14 Two-Way Left-Turn Lane Detail 2
02771-01 Curb, Curb and Gutter, and Header Details
02771-01 Curb, Curb and Gutter, and Header Details
Updated 11-26-2023
02775-06 Detectable Warning Curb Ramp Details
Detectable Warning Curb Ramp Details
Updated 11-26-2023
02775-09 Perpendicular Curb Ramp
Perpendicular Curb Ramp
Updated 11-26-2023
02775-02 Typical Curb Ramp Details
Typical Curb Ramp Details
Updated 11-26-2023
2147 Prerequisites Plan Procedures
Prerequisites Plan Procedures.
Live-Work Program (CE1277)
This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.
Last updated: 10/22/2024
Frequently Missed Inspection Items (CE1354)
Last updated: June 09, 2025
02754-03_2023_11_MOD.dwg
02754-03 Proposed Sidewalk Through Driveway with Excessive Elevation Difference
Updated 12-19-2023