Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02082-13 Storm Sewer Precast Box Manhole

Drawing 02082-13 Storm Sewer Precast Box Manhole (effective November 27, 2023)

 

Last updated: November 26, 2023

List of Standard Details-Storm Sewer Details

List of Standard Details – Storm Sewer Details  

House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 12-11-2023

2147 Prerequisites Plan Procedures

Prerequisites Plan Procedures.

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 2/13/2019

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018