Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02083N01 4'-0 Diameter Fiberglass Manhole Notes
02912-01 Tree Root Barriers (Circular)
02775-04 Curb Modification For Wheel Chair Ramps Crosswalks
02775-05 Commercial Curb Ramp Details
02775-06 Detectable Warning Curb Ramp Detail
02775-07 Detectable Warning Paver Option
02751-01 Concrete Pavement Details
02752-01 Pavement Expansion and Construction Joint Details
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: December 5, 2025
The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.
Last Updated: June 2024
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.