Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Importing Standard Details Guide

Guide on how to import standard details into the project title block.

Last updated: December 11, 2023

WCR Shopping Center Application (UA008)

Wastewater capacity reservation application form for shopping centers.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land

Last updated: 01/01/2025

Tenant Listing Form (UA010)

List of vacant and occupied spaces in a shopping center.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Updated: November, 2025.

Sewer Main or Lateral Application

Permit application for the construction of a sanitary sewer main or lateral taps to manholes.