Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Checklist 30pct 50pct And 70pct For Developer Participation Contract

Developer Participation Contract (DPC) checklist for developers.

Last updated: 3/21/2022

Standpipe Plan Review Checklist (CE1353)

The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.

Last Updated: June 2024

15-01-R Residential Drainage Plan Example

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

08RC04 Handrail Details (Residential & Commercial)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

02082-03 5'-0" - 8'-0" Diameter Precast Concrete Manhole
Residential One-Stop Guidelines (CE1050)

The Residential One-Stop Guideline lists the various requirements for plan submittal and review of residential construction projects.

Last updated: September 8, 2025

02082N-02 4'-0 Diameter Precast Concrete Manhole Notes
02082N-03 5'-0 to 8'-0 Diameter Precast Concrete Manhole Notes
02090-01 Manhole Frame And Cover

02090-01 Manhole Frame And Cover

02317-02 Sanitary Or SS Crushed Stone Foundation For Wet Stable Trench