Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This form is to be used for occupied residences only. Form must be received at least one day before the requested inspection date.
Revised 03/08/2024
Guide on how to import standard details into the project title block.
Last updated: December 11, 2023
CE-1314: Second Grade Stationary Engineer Application
Last updated: 06/28/2024
List of Registered Independent Energy Technicians.
Last Updated: February 18, 2026
For Plumbing, Electrical and HVAC reinspections.
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024
Form required to register or renew electrical licenses.
Last updated: January 2024
The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.
Last updated: February 19, 2026
List of approved special inspectors.
Last updated: February 19, 2026
This form shall be completed and submitted to the field inspector for the following residential projects: new construction, additions, complete remodels (all interior walls and ceilings are removed, or home square footage is changed ), and complete new ac systems.
Last Updated: 01/01/2023