Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The form is used to calculate an actual occupant load in educational spaces governed by the Texas Educational Agency (TEA) rules that limit maximum class size to approximately 2/3rds of that specified by the IBC occupant load factor identified in Table 1004.1.2 for educational spaces.
Updated 01-01-2023
Procedures for obtaining water main extension permit.
Last updated: 1/1/2019
Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.
Application for large meters.
Last updated: 6/13/2022
Procedures for obtaining a permit for lateral sanitary sewer main extension.
Last updated: 8/1/2018
Application for establishing a commercial water and wastewater billing account with Customer Account Services.
Last update: 01/04/2021
For shopping center with excess capacity.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
This document is maintained by the Utility Analysis & Planning Branch.
Updated 2/3/2020
The 2015 Houston Commercial Energy Conservation Code with local Amendments, effective December 9th, 2016, contains mandatory cool roofing provisions for new commercial buildings and alterations to existing commercial buildings.
Updated: 10/16/2019