Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Procedures to Cancel Project Numbers and Permits (CE1089)

Guide explains the process for canceling abandoned projects numbers and permits. 

Last updated: February 2024

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land

Last updated: 01/01/2025

Quick Start I Plan Review Procedures (CE1071)

To provide a means for expediting the plan review of large commercial design projects prepared by professional (licensed architect/engineer) designers, and which are ready for final plan re-submittal for minimal corrections. A paid review meeting may be scheduled to review corrections for permit issuance

Last updated: 08-02-2023

Sign Administration Informational Letter #0005-2004 (CE-1441)

Clarification on original sign graphics.

Updated: December 5, 2025.

Informational Letter 0001-2003

Clarification on sexually oriented business (SOB) sign criteria.

Last Updated: November 2025.

Building Demolition Guideline (CE1075)

Guidelines for applicants wishing to remove or demolish a building or structure from a property.

Last updated: January 2026

Stormwater Quality Annual Engineers' Certification (OCE-1020)

Last Updated: January 2025