Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Procedures for obtaining water main extension permit.
Last updated: 1/1/2019
Procedures for obtaining a permit for lateral sanitary sewer main extension.
Last updated: 8/1/2018
Procedures for obtaining a water main abandonment permit.
Last updated: 1/1/2019
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2024
Procedures for obtaining a permit to install or relocate a fire hydrant.
Last updated: 7/1/2017
Procedures for obtaining a sanitary sewer tap permit.
Last updated: 8/1/2018
Service unit equivalent table for determining impact fees. (form UA005)
Last updated: May 20, 2021
Procedures for obtaining a water main offset permit.
Last updated: 1/1/2019
Permitting requirements and procedures for obtaining large water meter permits.
Last updated: 10/14/2021
Procedures for obtaining a small water meter.
Last updated: June 7, 2022