Use a mixture of filters or keywords to find documents and resources by department, type or topic.
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
Tip sheet for obtaining a floodplain permit for a residential remodel project in the floodplain.
Guide for obtaining a floodplain permit for a residential addition.
Quick reference guide to flood damage repairs in the floodplain.
Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.
Last updated: July 22, 2019
FEMA Fact Sheet - Federal Insurance and Mitigation Administration
Community Rating System
Last updated: 06/18/2020