Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: January 2026

Residential Interior Remodel Tip Sheet

Tip sheet for obtaining a floodplain permit for a residential remodel project in the floodplain.

Residential Addition Tip Sheet

Guide for obtaining a floodplain permit for a residential addition.

Repairing Flood Damage Fact Sheet

Quick reference guide to flood damage repairs in the floodplain.

2016 Floodplain Management Plan
Letter of Map Change Process

Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.

Last updated: July 22, 2019

Community Rating System - FEMA Fact Sheet

FEMA Fact Sheet - Federal Insurance and Mitigation Administration

Community Rating System

 

Last updated: 06/18/2020

PPI 2021

Public information plan for the Community Rating System.

 

Last updated: 1.21.2021

FIA 2024