Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017

Developer Payment Bond - Non DPC

Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Sewer Tap Permit Procedure

Procedures for obtaining a sanitary sewer tap permit.

Last updated: 8/1/2018

Impact Fee Service Unit Equivalent Table (UA005)

Service unit equivalent table for determining impact fees. (form UA005)

Last updated: May 20, 2021 

Consent to Encroachment over City Easement

Form PW-9873C for consent to encroachment over a City easement.

Last updated: June 2020

Form 584 - Water Meter Easement Dedication

Easement dedication form for water meters (Form 584)