Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Review Cycle Specification Redlines

2019-2020 Review Cycle Standard Specifications Redlines

Review Cycle Detail Redlines
2016 Design Manual For Submersible Lift Stations

Engineering Design Manual for Submersible Lift Stations July 2016

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated: March 2024

2023 List of Standard Details_Tree & Hardscape Details.pdf

List of Standard Details-Tree and Hardscape Details

Chapter 13 2021
Occupancy Compliance Inspection Handout

All commercial properties in the City of Houston are required to obtain and display a Certificate of Occupancy.

Revised 06-04-2021

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

General Requirements and Standard Construction Specifications Redlines from 2022-2023 Review Cycle

Updated 11-26-2023

Standard Details Redlines from 2022-2023 Review Cycle

Standard Details Redlines from 2022-2023 Review Cycle

Updated 11-26-2023