Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This presentation was delivered at the Houston Permitting Center Annual Workshop on November 19, 2024.
Updated: 11.19.2024
POLICY CLARIFICATION DOCUMENT. 42‐156: Garage Building Line requirement for the side of corner lots in Extra‐Territorial Jurisdiction (ETJ)
Shared driveways must intersect with a public street that has a roadway width of 18 feet or more as measured at the narrowest point of the roadway adjacent to the tract (see Chapter 42, section 145).
Last Updated: June 2015
A Garbage Collection Plan is required for a development or subdivision that contains lots that take access from private streets, permanent access easements, or shared driveways located inside the City of Houston Corporate Limits, that proposes 25 residential units or less.
Reference Guide: Additional Required Parking - Chapter 42-186b
INFORMATION & REFERENCE GUIDE: Class 1 - Amending Plat