Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.
Last updated: July 22, 2019
This technical memo is provided to describe the significant changes to the Houston Construction Codes with regards to the requirements of an Atrium’s means of egress and separation requirements.
Uploaded 2-13-2024
Clarification on inflatable holiday devices and seasonal holiday displays.
Updated: November 2025.
Application form to request a determination of substantial damage.
01555-10 TCP Typical Construction Zone at a 4-Way Intersection (Low Volume Traffic) Phase 2 of 4
Updated 12-21-2023
Last Updated: April 2025.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.