Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: January 2026

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

SWQ Guidance Manual
TIA Scoping Meeting - Typical Meeting Agenda
Residential Interior Remodel Tip Sheet

Tip sheet for obtaining a floodplain permit for a residential remodel project in the floodplain.

Sign Administration Informational Letter #0021-2025 (CE-1442)

Awning & Canopy-type Signs.

Last Updated: December 5, 2025

Informational Letter 0003-2004

Clarification on awning signs.

Informational Letter 0015-2008 (CE-1443)

Electrically listed signs (section 406.6 of Electrical Code)

Emergency Responder Communication Coverage Guideline (CE1350)

The Houston Construction Code requires Emergency Responder Communication Coverage (ERCC) in all buildings. The Houston Fire Department (HFD) and Building Code Enforcement (BCE) initiated a practice of compliance verification, effective June 6, 2018.

Updated: July 2025.

Storm Water Quality Permit Instruction (OCE-1015b)

Storm Water Quality Permit Instruction

Last Updated: August 2024