Use a mixture of filters or keywords to find documents and resources by department, type or topic.
2023 Standard Construction Specifications
Updated 11-27-2023
Last Updated: February 2025
Building permit application for residential and commercial projects
Last updated: 05/27/2021
Step by step guide for applying for a wastewater capacity letter online.
Last updated: January 18, 2022
Builder's bond for sidewalk, driveway, curb and gutter. Bond period of less than one year.
For shopping center with excess capacity.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
List of the currently adopted codes.
Last updated: 03-07-2024
Request for deferred plan submittal.
Last updated: June 02, 2025.
A general overview of the residential building permit process. This presentation will outline the basic steps involved in submitting plans for review, obtaining permits, and scheduling inspections for one and two-family dwellings.
Last updated: 5/22/2023