Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Procedures for obtaining water main extension permit.
Last updated: 1/1/2019
Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.
Procedures for obtaining a permit for lateral sanitary sewer main extension.
Last updated: 8/1/2018
Procedures for obtaining a water main abandonment permit.
Last updated: 1/1/2019
Procedures for obtaining a permit to install or relocate a fire hydrant.
Last updated: 7/1/2017
Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.
Procedures for obtaining a sanitary sewer tap permit.
Last updated: 8/1/2018
Easement dedication form for water meters (Form 584)
Procedures for obtaining a water main offset permit.
Last updated: 1/1/2019
One year surface restoration bond - informal contract
This document is maintained by Taps & Meters.