- Building Permit Application
- Declaration in Support of Application for City of Houston Building Permit
- Complete Sets of Plans Uploaded
- Commercial Prerequisite Checklist (CE-1105) and the documentation listed on it
Building Permit Application and complete sets of plans uploaded. Based on the scope of the work architectural, structural, civil, mechanical, electrical, plumbing, sprinkler/standpipe, fire alarm, and fire-suppression drawings may be required.
All plans must be submitted electronically. To submit your plans for review, follow these steps:
- Log in or register for an iPermits account.
- Complete a permit application in the iPermits portal.
- Pay any applicable fees associated with the application.
- After permit fees have been paid, you will receive an invitation to upload plans into ProjectDox.
- Upload all required documents and drawings to ProjectDox.
- Mark the assigned task "complete" to finalize your plan submission.
For a complete and detail list of steps, please refer to the EPR User guides at https://www.houstonpermittingcenter.org/our-services/eservices.
Please keep a copy of the permit and the approved copy of the plans (if applicable) on-site for inspection. If corrections are required, you will need to reschedule the inspection.
To schedule an inspection online:
1. Access our scheduling website through the link below.
2. Enter the appropriate project number into the field and click the Submit button.
3. Select the appropriate permit type from the drop-down box and click the Submit button.
4. Click on the "Request" link.
5. Select the type of inspection(s) that you wish to schedule by clicking on the text box besides it/them.
6. Enter your license number (digits only) and scheduling PIN number and click the Submit button
To schedule inspections, contact the Interactive Voice Response (IVR) System at 713-222-9922.
Please follow the prompts and have the project number and your scheduling PIN readily available.
In order to schedule an inspection, the master plumber license registrations must be in good standing.
Inspections that repeatedly fail may be charged a re-inspection fee in addition to an admin fee.
Prior to scheduling an inspection, please make sure that the permit is not inactive and that all holds (if any) have been approved.
Applicants may now sign up for email or text notifications via our Inspections Notification System.