Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02082-10 (2020 Detail)
2020 Detail for 02082-10 Standard LDWL Access Manhole Details
Sprinkler Go-to-Work Permit Guideline (CE1260)
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
02082-11 Standard LDWL SAF-T Climb Details for Extra Depth Manhole
02524-03 (2020 Detail)
2020 Detail for 02524-03 LDWL Air Valve Assembly in Service Manhole Detail
02512-03 Back Tap On Existing Steel Line
02526-12 Structural Details Turbine Compound Meter Standard Services
02526-06 Typical Piping Arrangement 10-inch Turbine Compound Meter
02524-02 LDWL Combination Air Valve Assembly in Service Manhole Details
02526-17 Schematic Above Ground Electromagnetic Meter Installation
02526-08 Typical Piping Arrangement 8-inch Fire Service Turbine Meter